[Case Study] Company J - Mobile Test Equipment Rack
Significant cost reduction achieved through design reuse based on past rack manufacturing achievements! Introducing case studies for problem-solving.
During our sales activities, we received a consultation from a representative of Company J regarding difficulties with moving testing equipment within their premises. The company’s factory covers a vast area, and they faced challenges with the hassle of reservations, arrangements, and procedures for moving vehicles within the site. Therefore, we traced past rack manufacturing achievements on the sales side and discovered a rack produced for the same client but for a different product. With the client's permission, we reused the design and commercialized a mobile testing equipment rack. [Challenges] ■ Due to its height and weight, it requires considerable effort to load and unload. ■ Reservations, arrangements, and procedures for moving vehicles within the site are cumbersome. ■ It is dangerous to transport with a cart as there are no enclosures. *Many other cases are also published. For more details, please refer to the "Contract Case Collection" or feel free to contact us.
- Company:高和電氣工業
- Price:Other